News

News Releases

November 07, 2011  Mountain Boy Signs Investor Relations Agreement
November 02, 2011  12.04 g/t Gold over 15.85 Metres Intersected on Down Dip extension of the Upper Montrose Zone
October 27, 2011  Drilling on the Silver Coin Property Intersects 7.97 g/t Gold over 14.3 meters including 12.54 g/t over 8.2 meters and 2.86 g/t over 44.9 meters
October 19, 2011  Drilling on the Silver Coin Property Intersects 5.27 g/t Gold over 11.8 meters and 8.11 g/t Gold over 5.1 meters, including 22.79 g/t over 1.6 meters in Hole SC11-386
October 13, 2011  Silver Coin Property Update
October 11, 2011  43.7 g/t Gold over 7.4 Metres Intersected on Southwest extension of the Upper Montrose Zone
October 06, 2011  10 g/t Gold over 13 Metres Intersected on Upper Montrose Zone
September 13, 2011  Drilling Commences at the MB Silver Property
September 09, 2011  Step-Out Drilling Started on Upper Montrose Zone
September 08, 2011  Silver Coin Drilling Update: Excellent Progress and Continued Strong Results. 2.50 g/t gold over 11.6 meters, including 16.3 g/t over 0.6 meters in Hole SC11-362, and 2.82 g/t gold over 13.4 meters, including 6.07 g/t over 2.6 meters in Hole SC11-370.

Previous. All pages. Next. Page 1. Page 2. Page 3

 

Mountain Boy Minerals Property Locations

Corporate Presentations and Downloads